Public Access
37 lines
1.2 KiB
Markdown
37 lines
1.2 KiB
Markdown
# DEVX-171: create_dependency_pr uses target-project task ID + generated spec
|
|
|
|
## Problem
|
|
|
|
Dep PRs fail target-repo validation: infra requires `OBL-INFRA-N` in the
|
|
branch name and `docs/specs/<TASK>.md` in the diff. The tool created the
|
|
Vikunja task in the *producer's* project and named the branch
|
|
`deps/<pkg>-<ver>` with no task ID, and wrote no spec.
|
|
|
|
## Approach
|
|
|
|
REQ-1: Create the tracking task before branch creation, in the target
|
|
repo's Vikunja project via `--task-project-id` (default:
|
|
DEVX_VIKUNJA_PROJECT_ID). Embed the returned identifier in the branch
|
|
name (`deps/<TASK>-<pkg>-<ver>`) and PR title, and commit a generated
|
|
`docs/specs/<TASK>.md` with the required sections alongside the pin bump.
|
|
|
|
## Test Plan
|
|
|
|
- Branch name and PR title carry the target task ID; spec file added.
|
|
- `create_vikunja_task(project_id=N)` passes N to VikunjaClient.
|
|
- Existing no-task behavior preserved when Vikunja is unreachable.
|
|
|
|
## Deploy Plan
|
|
|
|
devx release tag; producer workflows pass `--task-project-id` for infra
|
|
(project 3).
|
|
|
|
## Rollback Plan
|
|
|
|
Revert; dep PRs keep failing target validation (status quo).
|
|
|
|
## Acceptance Criteria
|
|
|
|
- [x] REQ-1: `--task-project-id` supported; branch/spec/PR title embed
|
|
the target task ID; covered by unit tests at 100% coverage.
|